Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

November 24, 2023

June 30, 2026

1 Airport Rd

Paving, Site Work

No Information to Display

$525,000.00

Public - City

img_map_placeholder

1 Airport Rd, Manchester, NH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Manchester, New Hampshire, Department of Aviation is seeking bids for the Airport Pavement Maintenance Project for City FY 2024-2026. The scope of the work includes the rehabilitation of hot mix asphalt pavement for Airport public roads and parking lots as well as hot mix asphalt and Portland cement concrete airfield pavements. Work to be performed generally includes milling, hot mix asphalt overlay, crack sealing and repair, patching, seal coating, concrete joint sealing, and concrete spall repair. The project will occur over multiple years from 2024-2026. Pavement rehabilitation work will be subject to the Airport's available funding in accordance with the City of Manchester Procurement Code, Section 39.06 Authority to Award and Availability of Funds. Bidders should be aware that there is no guarantee that any work will result from this selection process and that if an assignment is undertaken, in part or in whole, that there is no assurance of further work or assignments. The Airport reserves the right during the performance period to issue for bid comprehensive pavement rehabilitation project(s) and that no guarantee of work will be provided for any given fiscal year. The successful bidder(s) will enter into an Indefinite Delivery - Indefinite Quantity (IDIQ) contract. The City reserves the right to select more than one bidder. The scope of the work includes the rehabilitation of hot mix asphalt pavement for Airport public roads and parking lots as well as hot mix asphalt and Portland cement concrete airfield pavements. Work to be performed generally includes milling, hot mix asphalt overlay, crack sealing and repair, patching, seal coating, concrete joint sealing, and concrete spall repair No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. Every request for such interpretation shall be in writing by email at john.gorham@jacobs.com and to be given consideration, must be received at least three (3) working days prior to the date fixed for the public opening of bids.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.