Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

$50,000.00

Public - County

img_map_placeholder

To Be Determined, Fayetteville, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Fayette County is seeking bids from qualified contractors to install restroom partitions, in the upstairs and downstairs restroom at the Public Works building. 1. Each restroom partition shall be a solid polymer (high density polyethylene, or HDPE) 2. Plastic toilet compartment mounted on the floor and braced overhead. 3. Color shall be cream. 4. Installation shall include urinal screens with floor supports. 5. Install new brushed vault hinge door hardware and surface mounted slide latch. 6. Door pulls for handicapped door and vandal resistant stainless-steel fasteners shall be included. 7. Contractors shall be responsible for obtaining measurements. 8. The new partitions shall have the same measurements and setup as previous. 9. The County will remove the old partitions before contractor installs new ones. 10. Building permit not required for this project. 11. The work shall be between 8:00 a.m. to 5:00 p.m. Monday - Friday. Contractor may work Saturday if approve by the County. 12. Contractor shall be responsible for all materials needed to complete this project. 13. Contractor is responsible for storage of material while working on the project. If a storage unit is needed contractor will be shown where it can be put. 14. Contractor shall be responsible for personnel, equipment, vehicles, tools, and materials needed to complete this project. 15. Contractor shall be responsible for the conduct of their personnel while on county property or in county buildings. 16. County has a no smoking policy on county property or in county building. Contractor shall abide by this policy. 17. Contractor shall be responsible for and liable for any damage cause by them during this project. 18. County personnel shall inspect the work and stop the work if any deficiencies are found. Work shall not start back until the problem is solve. Question Deadline 10/12/2023 at 12:00 PM ET If you have questions, contact Sherry White via email swhite@fayettecountyga.gov.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects