Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

January 8, 2024

April 1, 2024

Multiple Locations

Demolition, New Construction, Paving, Site Work

No Information to Display

$1,077,935.00

Public - County

img_map_placeholder

Multiple Locations, Shoshone, ID

Subscribe to View Full Documents

Precast Concrete Stiffleg Bridge Bundle Group 4 (Gooding & Lincoln Counties) Site Directions: This is a bridge bundle with one bridge in Lincoln County and the Other in Gooding County Idaho *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Est. Value Notes: Estimated construction value is between $1.2 and $1.6 million. perform construction including removal of the existing bridges at 650 W and 1400 S Roads, replacing the bridges with new precast concrete stiffleg structures, and performing other associated roadway work. The 1400 S Bridge is located between 2050 E Road and 2100 E Road, and crosses over the Poorman Ditch. It is located approximately 4.50 miles northeast of the City of Gooding. The 650 W Bridge is located between 720 N Road and 620 N Road, and crosses over Milner Gooding Canal. This project is to remove the existing bridges at 650 W and 1400 S Roads and replace the bridges with new precast concrete stiffleg structures. The 1400 S Bridge is located between 2050 E Road and 2100 E Road, and crosses over the Poorman Ditch. It is located approximately 4.50 miles northeast of the City of Gooding. The 650 W Bridge is located between 720 N Road and 620 N Road, and crosses over Milner Gooding Canal. It is located approximately 9.5 miles northwest of the City of Shoshone The following special provisions, and all addenda issued, supplement or modify the 2023 Idaho Transportation Department Standard Specifications for Highway Construction, April 2023 Standard Drawings, and Special Provision-State-

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.