Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

December 25, 2023

November 19, 2024

Multiple Locations

Site Work

No Information to Display

$5,215,993.00

Public - City

img_map_placeholder

Multiple Locations, Hermiston, OR

Subscribe to View Full Documents

The Work for this Project includes, but is not limited to, the installation of approximately 13,750 linear feet (LF) of 30-inch ductile iron water pipe with two separate jack and bore railroad crossings and a canal crossing, an additive alternate for 8,500 LF of 18-inch polyvinyl chloride industrial wastewater line and 2,250 LF of 8-inch pressure sewer line with two separate jack and bore railroad crossings, and 12,000 square yards of surface restoration. A pre-bid conference will not be held for this Project. The Project has an expected duration of 270 days. Est. Value Notes:Base Bid - $8,000,000 to $8,500,000; Additive Alternative - $3,000,000 to $3,500,000 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.Question Deadline 10/17/2023 7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing.

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.