Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

December 11, 2023

June 8, 2024

To Be Determined

Site Work

No Information to Display

$700,000.00

Public - City

img_map_placeholder

To Be Determined, Ruston, LA

Subscribe to View Full Documents

Project: Merger with Concord Water System Project Classification: Municipal and Public Works Contract Time: 180 consecutive calendar days Liquidated Damages: $400.00 per calendar day Each proposal is to be accompanied by a certified check payable to the Town of Marion or a bid bond, the amount of either of which shall be five percent (5%) of the amount of the bid. Bidders are advised that both a Performance Bond and a Payment Bond, each in the amount of 100 percent (100%) of the Contract Price, will be required. No Bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. The Town of Marion reserves the right to reject any or all proposals for just cause.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.