Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 1, 2024

April 22, 2024

Erste Strasse

Paving, Site Work

No Information to Display

$1,800,000.00

Public - City

img_map_placeholder

Erste Strasse, Snoqualmie Pass, WA

Subscribe to View Full Documents

Installation of approximately 4,600 L.F. of 12" ductile iron water transmission main, valves, water services, fire hydrant assemblies, two PRV stations, 700 tons of HMA paving, and related improvements. All questions should be directed to Terry D. Alapeteri, PE at (509) 966-7000 or talapeteri@hlacivil.com. This contract has eighty (80) working days to complete the work. Each bid or proposal must be accompanied by bond or a certified check, payable to the order of the Treasurer of the Snoqualmie Pass Utility District for the sum of not less than 5% of said bid or proposal and none will be considered unless accompanied by such deposit, to be forfeited to the Snoqualmie Pass Utility District in the event the successful bidder shall fail or refuse to enter into a Contract with the City for the making and construction of the aforesaid improvement. All bids or proposals must be in writing on the form bound in the Specifications, sealed and filed with the Clerk on or before the day and hour above mentioned.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.