Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 28, 2024

No Information to Display

500 Big Thompson Ave

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

500 Big Thompson Ave, Estes Park, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000332081 The Town of Estes Park (TOEP) seeks proposals from qualified Consultants and/or Firms to provide professional transportation engineering and design services for two separate yet geographically adjacent and interconnected projects: Town Parking Lot Redesign - Redesign the Estes Park Visitor Center parking lot, located at 500 Big Thompson Avenue. The redesigned parking lot should provide improved vehicular circulation allowing the facility to continue serving a variety of transportation needs for both residents and visitors to the Town, including multiple transit services, ride share, electric vehicle (EV) charging stations, bicycle and pedestrian facilities, and related placemaking and wayfinding amenities. This scope includes preparation of bid-ready construction documents for the parking lot and related improvements. US 34 Corridor Study - Conduct a Corridor Study of Big Thompson Avenue (US 34) between the area just west of the US 34 / US 36 intersection (near the entrance to the Ed's Cantina / Kind Coffee private parking lot) and Steamer Drive. This corridor was identified in the 2018 Downtown Plan for transportation improvements including new potential pedestrian crossings, streetscape improvements, multimodal safety enhancements, traffic signal optimization, intersection modifications including a roundabout, and increased connectivity to transit and parking. This study will require community engagement, traffic analysis, preparation of a summary report, and development of conceptual plans with cost estimates. Question Acceptance Deadline10/16/2023 at 2:00 PM MT Questions are submitted online No -- Written questions should be submitted to the Mobility Services Manager via email or via online . *The Town reserves the right to amend the RFP at any time

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.