Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 6, 2023

December 6, 2023

December 15, 2024

Multiple Locations

Site Work

No Information to Display

$800,000.00

Public - City

img_map_placeholder

Multiple Locations, Aurora, MN

Subscribe to View Full Documents

Aurora, MN - Water Main - East Range Joint Water Project (AUROR 159723) TGB goal of 5% Major components of the Work include: New water transmission main All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda provided to all parties recorded by Engineer as having received the Bidding Documents. This Work is being funded by a Drinking Water Revolving Fund Loan through the Minnesota Public Facilities Authority and shall be subject to minimum wages and labor standards in accordance with Minnesota Department of Labor and Industry, State Prevailing Wages for Highway and Heavy Construction. The project also includes DBE and M/WBE goals and is required to comply with American Iron and Steel (AIS) requirements. The Owner reserves the right to retain the deposits of the three lowest Bidders for a period not to exceed 60 days after the date and time set for the opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the Owner. Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The determination of the low bid for Bid Award will be based on the Sum Total Amount of the Base Bid and all of the Add Alternates. The City reserves the right to award the base bid and any combination (if any) of the Add Alternates as determined by the City to be in its best interest. The City reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City of Aurora.

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.