Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 27, 2023

December 31, 2024

CR 3344

Paving, Site Work

No Information to Display

$5,800,000.00

Public - City

img_map_placeholder

CR 3344, Tyler, TX

Subscribe to View Full Documents

This project shall consist of furnishing all necessary materials, machinery, equipment, superintendence, and labor for the Paving and Drainage Improvements to CR 3344 (From CR 336 to S.H. 155) for Smith County, Texas. Smith County reserves the right to accept or reject in whole or in part any bid received and to waive any irregularities or formalities in the best interest of Smith County. A Bid Bond is required for this project. Question Deadline 10/19/2023 at 5:00 PM CT Any prospective bidder desiring any explanation or interpretation of the solicitation must make a written request. The request must be addressed to Jaye Latch, County Purchasing Director and emailed to purchasing@smith-county.com. The improvements for this project shall consist of the following work items and/or categories. This description may not include all the work items that are required for this project, whether the items are paid or subsidiary to pertinent items. The project provides for the construction of a new 30-ft. wide county road (Length = 8346 feet), with 40-ft. wide intersection flares, with cement treated subgrade, HMAC base, and HMAC surface, and the installation of storm sewer and drainage crossing structures, installation of utility casings at crossings, with pavement markings, and all necessary appurtenances. The project also includes the installation of a deceleration lane along SH 155 with cement treated subgrade, HMAC base, one course surface treatment, and HMAC surface. The project is located on a new alignment which will allow the road to be closed to public access during the construction of the project. The construction of the deceleration lane along SH 155 will require a traffic control plan and traffic to be maintained throughout the duration of the project. The construction of the intersection at CR 336 and the I-20 Frontage Road will require a traffic control plan and traffic to be maintained, except during critical work items. Closure of the I-20 Frontage Road roadway for critical work items shall be allowed but limited as much as possible. Contractor shall notify affected property owners prior to such closures. Final cleanup of all work areas shall be made prior to final acceptance of the project. Prospective Bidders are expected to inspect the site of work and to inform themselves regarding all local conditions.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.