Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

November 30, 2023

March 29, 2024

200 Enola Rd

Site Work

No Information to Display

$440,000.00

Public - State/Provincial

img_map_placeholder

200 Enola Rd, Morganton, NC

Subscribe to View Full Documents

For the furnishing of labor, material and equipment entering into the construction of Exterior Wall Waterproofing at WorkSource West 200 Enola Road Morganton, North Carolina. Exterior wall/foundation waterproofing shall include excavation, removal of, and installation of new below grade waterproofing within designated areas as well as other above grade areas of water prevention. Bids will be received for Single Prime - General Construction. All proposals shall be lump sum. The Contractor will not be required to submit to DHHS documentation verifying that each worker is complying with the fully vaccinated or weekly negative COVID-19 test result requirement of the policy. DHHS has developed attestation forms for the Contractor to complete and submit to DHHS attesting on behalf of their sub-contractors and consultants; however, attestation forms will not be required from contractors on this project. sub-contractors and consultants; however, attestation forms will not be required from contractors on this project. All contractors will be required to follow the local institutional protocols. Whatever policies are implemented for interior and/or exterior space at the time the project commences with construction will be the requirements for contractors.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.