Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

December 7, 2023

No Information to Display

450 Dolle Ave

Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

450 Dolle Ave, Seguin, TX

Subscribe to View Full Documents

The last day to submit questionsis October 20, 2023, by 5 p.m. An addendum answering all questions received will be issued by October 25, 2023. Each bid must be accompanied by a certified or cashier's check or an approved bidder's bond in an amount not less than 5% of the maximum total bid, payable to the City of Seguin, Texas, without recourse, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds on the forms provided, within ten (10) days after the award of contract. The City of Seguin reserves the right to reject any or all bids and to waive informalities Questions regarding interpretation of specifications, bids, bid results or bid awards should be directed in writing to the Buyer indicated in the General and/or Technical Specifications or to the Purchasing Manager, twood@seguintexas.gov and be referenced by bid number and bid title. The City of Seguin intends to hire one (1) highly qualified general contractor to provide all labor, equipment, materials, and insurance as required for the construction of one (1) concrete basketball court, as specified herein, within the Future Park Property located at 450 Dolle Avenue, Seguin, Texas. 2.0 Bidders are encouraged to visit the lighted basketball court at Seguin's Park West located at 809 San Antonio Avenue. The City's intention is to duplicate the Park West example at the Future Park Property. Excavate and construct a new concrete basketball court per the specifications on sheet C2. 4.0 The finished concrete basketball court should be approximately 1 to 4 inches above the existing grade, depending on the overall grade. Backfill as needed. 5.0 Apply one (1) coat of textured acrylic resurfacer over the entire court. 6.0 Apply two (2) coats of textured color (dark green) over the entire court. 7.0 Apply textured white lines per the specifications. 8.0 Furnish and install basketball goals per the specifications.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects