Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

January 2, 2024

No Information to Display

Pond Branch Rd

Paving, Site Work

No Information to Display

$600,000.00

Public - County

img_map_placeholder

Pond Branch Rd, Summit, SC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

SCOPE OF WORK Interested Consultants shall develop a team of professionals who are capable of offering the variety of services defined herein. Services required under this contract may include, yet not be limited to Project Management The CONSULTANT will be responsible for providing a monthly status report along with the monthly invoicing that details the month s activities and report upcoming project milestones. Tentative Award Release Date: Week of Nov. 6, 2023 Tentative Contract Start Date: January 2, 2024 Question Deadline 10/19/2023 at 2:00 PM ET The Committee reserves the right to interview some or all of the prospective firms. The method of Contractor Selection has not been Determined at this time. SCOPE OF WORK A. Interested Consultants shall develop a team of professionals who are capable of offering the variety of services defined herein. B. Services required under this contract may include, yet not be limited to: 1. Project Management: a. The CONSULTANT will be responsible for providing a monthly status report along with the monthly invoicing that details the month's activities and report upcoming project milestones. b. Prior to initiating the design process, a complete field reconnaissance will be performed by the CONSULTANT to inventory the existing storm drainage and to verify the boundaries of tributary watersheds draining through the project. Preliminary studies will be performed to determine existing drainage conditions within the project area. c. The CONSULTANT will prepare materials and attend a project kickoff meeting with the COUNTY prior to initiating the design process. 2. Field Surveys: a. Field surveys will be performed to determine accurate elevations and locations of existing facilities, e.g., roadways, bridges, culverts, existing stormwater outlets, utilities, pavement

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.