Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 19, 2023
November 20, 2023
December 15, 2023
201 Chace Rd
Site Work
No Information to Display
$31,400.00
Public - City
201 Chace Rd, East Freetown, MA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Labor and Materials to remove existing gas pumps and concrete pad and replace with new concrete fueling mat and reinstall gas pumps at Freetown Highway Department. Contractor Qualification: Highway Division Question Deadline 10/12/2023 at 12:00 PM ET Bidders shall make written requests to Deborah Pettey, procurement@freetownma.gov In accordance with M.G.L. 30 39 - Public Works (NON-Building) Construction Contracts with labor, the Town of Freetown, MA is seeking quotations from qualified vendors to remove and replace the concrete fueling mat at the Highway Department, 201 Chace Road, East Freetown, MA. Must be completed over three-four days if possible utilizing weekend hours if possible. 1) Notify Dig Safe of limits of Digging 2) Apply for Permits (fees will be waived) 3) Drain product in lines prior to removing existing dual product dispenser 4) Provide electrician and mechanic to disconnect existing dispenser conduit and piping. Existing MPD to be put aside and reused after mat replacement. 5) Remove existing pump 6) Demolish, remove and legally dispose of the existing 42ft X 1 Oft concrete fueling pad. Saw cut or direct break away the existing pad along the front face to preserve the steel protective bollards for re-use if possible. 7) Saw cut the existing asphalt surface around the area to create a smooth edge to pour the new concrete pad up against. 8) Furnish and install 3/8 Pea Stone or 14" Processed Gravel necessary to prepare the sub base for the new concrete pad. 9) Construct, Form and Pour one approximately 42ft X 10ft X 8-inch-thick steel reinforced concrete pad with 4000 PSI Concrete with Spill Grooves around all four sides for Vehicle Fueling. 10) Saw Cut the new concrete pad the day after the pour for expansion crack prevention. 11) Seal Concrete Mat 12) Reattach, plumb & wire the removed pump 13) Asphalt Restoration is the responsibility of others
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
East Freetown, MA
Bid Date: Oct 04 2023
East Freetown, MA
Bid Date: Sep 11 2023
East Freetown, MA
Bid Date: Jun 26 2023
East Lynn, MA
Bid Date: Oct 25 2023
Somerville, MA
Bid Date: Nov 08 2023
Groveland, MA
Bid Date: Nov 09 2023
Boston, MA
Bid Date: Oct 30 2023
Boston, MA
Bid Date: Oct 30 2023
Plymouth, MA
Bid Date: Oct 24 2023
Chicopee, MA
Bid Date: Oct 26 2023
Lowell, MA
Bid Date: Oct 25 2023
New Bedford, MA
Bid Date: Oct 19 2023
Falmouth, MA
--
Sturbridge, MA
Bid Date: Oct 26 2023
Worcester, MA
Bid Date: Aug 08 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.