Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

October 27, 2023

November 15, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$39,019.00

Public - City

img_map_placeholder

Multiple Locations, Conway, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Asphalt Reclamation in the Town of Conway. Prevailing Wages apply. FRCOG is administering this RFQ on behalf of the Town of Conway. Question Deadline 10/10/2023 at 12:00 PM ET Written questions regarding this RFQ must be received no later than Tuesday Surface Preparation Surface preparation, which may include cleaning and grubbing; removal of visible cobbles; drainage; sign, mail boxes and guard rail resetting; etc., will be the responsibility of the municipality and will be completed before the contractor moves onto the job. However, adjusting of street irons - valve covers, manhole covers, drop inlet gratings, catch basins will be the responsibility of the Contractor and is to be included in the pricing. Protection of Structures is defined as: installation of an approved geotextile fabric under all catch basin grates, and supplementally cover all existing catch basin grates with approved steel plates, so that no soil and/or milled material enters into the structure, however at no time are the catch basins to be placed fully out of service. In the event material does enter into the structure then the Contractor shall immediately clean the unit to the satisfaction of the Participant. Once the work has been completed, and the roadway leveled, then the Contractor is to remove the plates from the catch basin structures. Traffic Control Traffic control, including flagging or police details, warning lights, barricades, and warning signs, is the responsibility of the municipality. Unless otherwise specified, the roadway shall be kept open to traffic at all times, with traffic discontinued on the lane being reclaimed. Controlled traffic may be permitted as soon as the base has been rolled. Structures Per MassDOT specifications for Asphalt Reclamation, lowering of structures (lowered below subgrade and plated) is incidental and not paid as a separate pay item. The number of structures is given for information on the estimates page and bid form, but shall be included in the total price. Additional, over the number on the estimates sheet may be paid at the Additional Item price.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.