Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

March 3, 2024

Midway Canal

Site Work

No Information to Display

$550,000.00

Public - City

img_map_placeholder

Midway Canal, Dos Palos, CA

Subscribe to View Full Documents

The Work includes: New reinforced concrete long crested weir structures, new reinforced concrete floor caps for existing long crested weir structures, saw cutting new gate openings through existing structure walls, installation of metal sluice gates furnished by others, and demolition of an existing concrete canal structure. The bids must be accompanied by a certified check or bidder's bond for ten percent (10%) of the amount of the bid and made payable to Henry Miller Reclamation District No. 2131 (District). The successful bidder will be required to furnish a performance bond in an amount equal to one hundred percent (100%) of the contract price and a payment bond in an amount equal to one hundred percent (100%) of the contract price, said bonds to be secured from a financially responsible surety company, satisfactory to the District, authorized to do business in the State of California. The Work is "public work" subject to prevailing wages. Award will be made to the lowest responsible bidder, however, the District reserves the right to reject any or all bids, to waive informalities in the bid, and to postpone the date of bid opening.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.