Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 27, 2023

January 11, 2024

80 Washington St

Renovation

No Information to Display

$100,000.00

Public - State/Provincial

img_map_placeholder

80 Washington St, Hartford, CT

Subscribe to View Full Documents

Boiler Room Repairs - To provide repairs in the Boiler Room including but not limited to, Slab Demolition, at a Judicial Branch location in Hartford, Connecticut. Bid shall be accompanied by a bid bond or certified check in an amount equal to ten percent (10%) of the bid price Performance Bond is required. The Contractor shall submit a Performance Bond in an amount equal to the total contract price. For any contract that exceeds $100,000, the contractor must furnish a bond in the contract amount for the protection of persons supplying labor or materials hereunder. Bids are subject to rejection in whole or in part if they limit or modify any of the terms and/or specifications set forth herein. SUMMARY OF WORK The Contractor shall, at minimum, provide the following: Demolition and complete removal and disposal of a portion of an existing 10" thick concrete framed floor slab. o Removal of an existing non-load bearing CMU wall. o Design and installation oftemporary shoring. o Procurement and installation ofsafety fencing to be installed at an existing entrance door. o Installation of dust proof partitions around existing utilities to remain. o Temporary re-support of existing utilities to remain operational during demolition work. o Refer to the specifications, manual and drawings for more detailed information regarding this project.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.