Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

December 13, 2024

Multiple Locations

Site Work

No Information to Display

$450,000.00

Public - City

img_map_placeholder

Multiple Locations, Abbeville, SC

Subscribe to View Full Documents

Upper Long Cane Waterline Project. There is no pre-bid conference for this project. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidders maximum Bid price. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Upper Long Cane Waterline Project which includes furnishing all materials, equipment, and labor necessary to construct the following summary of Work: approximately 9,910 LF of 12" DI, 7,900 LF of 8" DI, and 5,885 LF of 6" DI waterlines with misc. appurtenances including (20) fire hydrants in and around the northwest side of the City of Abbeville, SC. A master metered connection with Donalds-Due West Water & Sewer Authority is also included in the project. The work is divided into a Base Bid with two (2) add alternates. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Question Deadline 10/26/2023 Project will be constructed under a single prime contract with a Base Bid which may be awarded with or without Alternate #1, and/or Alternate #2 so that the Project is within budget and in the Owner's best interest. B. The project is funded through a grant from the SC Infrastructure Investment Program (SCIIP). Applicable Federal requirements of 2 CFR 200, Appendix II are described in the Supplemental Conditions for Federal Projects included in the Bidding Documents. The Work of Project is defined by the Contract Documents and consists of the following: 1. Approximately 9,910 LF of 12" DI, 7,900 LF of 8" DI, and 5,885 LF of 6" DI waterlines with misc. appurtenances including (20) fire hydrants in and around the northwest side of the City of Abbeville, SC. 2. A master metered connection with Donalds-Due West Water & Sewer Authority is also included in the project. 3. The work is divided into a Base Bid with two (2) add alternates. D. Principal Items of Work Include: 1. Installation of waterlines and appurtenances 2. Master meter and PRV vault 3. Jack & Bores 4. Traffic control 5. Erosion & Sedimentation Control *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects