Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

No Information to Display

424 Summit Dr

Renovation

No Information to Display

$2,213,000.00

Public - County

img_map_placeholder

424 Summit Dr, Greenville, SC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Questions or comments regarding this solicitation document or the process shall be forwarded, in writing, to Ms. Tonya A. Stroud, Senior Buyer, and Mr. Matt Pettit, Director of Procurement, 2 Space Drive, Taylors, South Carolina 29687. Email addresses are: tstroud@greenville.k12.sc.us and mjpettit@greenville.k12.sc.us. Inquiries and comments shall be delivered to the Procurement Department no later than October 12th, 2023, at 9:00 A.M. EDT. The School District of Greenville County (District) invites interested firms to submit a SEALED BIDS for an HVAC Replacement at Summit Dr. Elementary School for Greenville County Schools students in accordance with the specifications and terms and conditions of this solicitation. Summary of project requirements below: 1. Replacement of VAV boxes as called out on plans and specifications. 2. Replacement of RTU's (roof top units) as called out on plans and specifications. 3. Replacement of HVAC controls wiring and equipment. 4. Demolition/removal/disposal of existing HVAC equipment to be replaced. 5. Replacement of boilers as called out on plans and specifications. 6. Demolition/removal/disposal of old boilers. 7. Removal and closing of existing wall vents in the gym. 8. Replacement/addition of required fire alarm equipment related to HVAC system. 9. Provide all labor and materials to complete work according to plans and specifications. To include all associated systems to make a complete project (gas piping, drains, vents, roof curbs, additional ductwork, etc.).

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects