Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 20, 2023

December 19, 2023

August 1, 2024

W 800 N

Paving, Site Work

No Information to Display

$3,400,000.00

Public - City

img_map_placeholder

W 800 N, Clinton, UT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The purpose of the prequalification process is to select those contractors the Owner deems to be qualified and capable of completing the project on schedule in conformance with the Contract Documents. Only those firms that are prequalified by the Owner will be allowed to submit a Bid on the Project. Please review the prequalification form for a full tentative project schedule. Contractors will be prequalified for the waterline and street work separately. The 800 North Roadway & Water Line Project: 450 W to 1000 W is a joint Clinton City, Clearfield City, and Weber Basin Water Conservancy District Project. The Project includes the reconstruction of the roadway from 450 West to 1000 West in Clinton and Clearfield, Utah. The project includes the following major components: Installation of approximately 2,000 linear feet of 12 PVC culinary water line (Weber Basin) and 1,600 linear feet of 8 PVC culinary water line (Clearfield City). Installation of two large pressure reducing valve/ meter vaults with related SCADA and electrical connections. Installation of 24" fused solid wall HDPE casing pipe and 16" fused solid wall HDPE carrier pipe underneath the UTA and UPRR tracks at 500 West via horizontal directional drill. Work will include assistance with final applications to UTA and UPRR. Installation of 24" fused solid wall HDPE casing pipe and 16" fused solid wall HDPE carrier pipe underneath the UTA box culvert near 950 West via horizontal directional drill. Work will include assistance with final applications to UTA. Installation of 16" fused solid wall HDPE casing pipe and 10" fused solid wall HDPE carrier pipe underneath the UTA box culvert near 950 West via horizontal directional drill. Work will include assistance with final applications to UTA. Resurfacing of concrete bridge deck, other minor bridge repairs and installation of Type F concrete barrier along bridge. Replacement of curb and gutter, sidewalk, and curb ramps along the roadway. Replacement of asphalt pavement for approximately 0.6 miles of roadway along with other common roadway work. The Owner reserves the right to waive any informality or seek additional information from potential applicants. Question Submission Close Date 10/20/2023 5:00 PM MDT Questions regarding the project or the prequalification of Bidders may be directed to: A. Matthew Crump, (801) 347-8550, mcrump@jub.com B. Bryce Wilcox, (801) 725-5002, bkw@jub.com Owner anticipates that the Project's total Bid price will be approximately $3,400,000. The water line portion of the project has an anticipated price of approximately $1,600,000.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.