Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

December 25, 2023

No Information to Display

168518 Bannock Road

Demolition, New Construction, Site Work

No Information to Display

$20,000,000.00

Public - State/Provincial

img_map_placeholder

168518 Bannock Road, Saint Clairsville, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project Description Belmont Correctional Institute (BeCI) is an adult minimum to medium-security prison facility operated by the Ohio Department of Rehabilitation and Correction (ODRC). BeCI was constructed in 1993 - 1994 and is comprised of approximately 15 buildings with a prison population of 2,673. The Transitional Program Unit (TPU) (Bldg 4) is 16,831 square feet. TPU was previously referred to as a 'segregation' unit. It is the intent of ODRC to demolish this building and replace it with a new stand-alone TPU building. The location of the new building may be in the same/current location or a new location within the confines of the secure perimeter. The development of a complete Program of Requirements (POR) will also be included as part of the Professional Design as an Additional Service. The development of the POR will include a comprehensive survey/field investigation of the building site, existing building and building systems. The project scope will be evaluated, prioritized, and defined to align with the project budget. Evaluation of the project construction schedule will also be a part of the POR stage For projects advertised with an appropriately developed Program of Requirements ("POR"), upon award of the Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by Developing the Program of Requirements. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth& Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Submit all questions regarding this RFQ in writing to Procurement at procurement@ofcc.ohio.gov Questions will be answered and posted on online. EDGE Participation Goal Percent of initial Total A/E Fee: 5.0%

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects