Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 20, 2023

December 20, 2023

July 17, 2024

613 E Franklin St

Site Work

No Information to Display

$250,000.00

Public - City

img_map_placeholder

613 E Franklin St, Fayetteville, TX

Subscribe to View Full Documents

Bids are invited for several items and quantities of work as follows: 1. Manually Cleaned Bar Screen 2. Lift station pump replacement 3. Cast-in-place concrete Aeration Basin, complete in place 4. Aeration piping and equipment 5. Return Activated Sludge pump 6. Yard piping 7. Electrical The deadline to ask questions is 11/13/2023 12:00 PM CDT A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid [for those contracts that exceed $100,000]. A certified check or bank draft payable to the City of Fayetteville or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. Performance Bonds - Requires all prime contractors which enter into a formal contract in excess of $100,000 with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to obtain a Performance Bond in the amount of the contract before commencing with work. Payment Bonds- Requires all prime contractors which enter into a formal contract with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to furnish to the governmental entity a payment bond in the amount of the contract. Attention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Texas Department of Agriculture Office of Rural Affairs and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin. The City of Fayetteville reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by City of Fayetteville for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. The City is an Equal Opportunity Employer. The City strives to attain goals for compliance with Federal Section 3 regulations by increasing opportunities for employment and contracting with Section 3 residents and businesses where feasible. All contractors/subcontractors that are debarred, suspended or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project. Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, and Section 3 Businesses are encouraged to submit bids. Each bidder should visit the site of the proposed work and should become acquainted with the existing conditions and facilities, the difficulties and restrictions pertaining to the performance of the contract. The bidder should thoroughly examine and become familiar with the drawings, technical specifications and all other contract documents. The contractor by the execution of the contract shall in no way be relieved of any obligation under it due to failure to receive or examine any form or legal document or to visit the site or the conditions existing at the site. The City will be justified in rejecting any claim based on lack of inspection of the site prior to the bid. Bidder agrees that the Work will be substantially complete in 180 calendar days and will be completed and ready for final payment in 210 calendar days in accordance with Paragraph 47 of the General Conditions.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.