Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 5, 2025

November 13, 2023

January 12, 2024

Multiple Locations

Renovation

No Information to Display

$62,000.00

Public - City

img_map_placeholder

Multiple Locations, Youngwood, PA

Subscribe to View Full Documents

The Work to be done under the Contract, as shown on the Plans and Specifications, shall include the furnishing and complete installation of all Materials and any other necessary Work required for proper completion, operation and use of the facilities. All the equipment, Materials and labor that may be necessary to complete the Work and place it in satisfactory operation, implied or intended in the Plans and Specifications, shall be furnished and/or installed by Contractor without extra cost to the Owner. The titles or headings of the various divisions, sections, paragraphs, subparagraphs or of Shop Drawings, and the Table of Contents and the indexes, as used in any of the Contract Documents are for convenience of reference only and are not intended to limit and shall not be construed as in any way limiting the application of the text. Bid 1 All New Salt Storage Structure and Awning - The work will consist of the contractor moving the existing approximately 50 washout/yard block across the public works storage yard to install new (about 68) washout/yard block to a height of approximately 8' that will have an arch structure and awning affixed. Bid 2 Additional Storage Structure and Awning - This work will consist of the contractor installing another course (about 16) of washout/yard block of a height of approximately 8' that an arch structure and awning will be affixed to. Youngwood Borough reserves the right to reject any or all bids or to waive any informality in bids received. Each proposal shall be accompanied by a certified check or Bidders Bond in the amount of ten percent (10%) of the proposal, in favor of Youngwood Borough. Bid Results :- Base Bid #1 Vince Building Company $ 62,000 Base Bid #2 Eagle Associates of Cazenovia, LLC $ 46,000

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.