Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

January 2, 2024

August 30, 2024

US-1

Paving, Site Work

No Information to Display

$3,573,000.00

Public - State/Provincial

img_map_placeholder

US-1, Detroit, MI

Subscribe to View Full Documents

10.96 mi of connected and automated vehicle device installation and wrong way driver system installation on M-1 from Adams Avenue northerly to I-696 in the cities of Detroit, Pleasant Ridge, and Royal Oak, Wayne and Oakland Counties. Net classification required for this project is 3573 ITS Control Sec ST 82131 ITS 82131 Job No 219114A 210866A Federal No 23A0931 21A0269 MI DOT - 2311 014 - Connected and Automated Vehicle Device Installation and Wrong Way Driver System Installation on M-1

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects