Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

November 30, 2023

March 29, 2024

314 Salter Path Rd

Renovation

No Information to Display

$180,000.00

Public - City

img_map_placeholder

314 Salter Path Rd, Atlantic Beach, NC

Subscribe to View Full Documents

scope of the work is, but not limited to as follows: 1. General Construction - Roof Overbuild 2. Plumbing System 3. HVAC System 4. Electrical work 5. All related work. A. General: All allowances considered in the Contract Price shall be clearly identified in the Contract and approved before signing. If the actual cost is more than, or less than the allowance, the Contract Price will be adjusted up or down accordingly when the actual cost is determined. Adjustments in the Allowances will be made by Change Order. Unless specified otherwise, the allowance amounts include the net cost of materials, and shipping charges. B. Cash Allowance: The Contractor's overhead, profit and taxes shall be included in the Contract Price, but not in the allowance. All allowances agreed upon shall clearly indicate materials only or materials and labor included as the case may be. For allowance listed as materials only, the Contractor shall include labor and installation in his base bid price. The contractor shall submit to the Architect for approval all bills for materials under Cash Allowances. The Contractor shall, unless otherwise specified, supply all labor, transportation, materials, apparatus, fuel, water, energy, light and tools necessary for entire, proper and substantial completion of his work and shall install, maintain, and remove all equipment for the construction, other utensils or things and shall be responsible for the safe, proper and lawful construction, maintenance and use of same and shall construct in the best and most workmanlike manner a complete structure and everything properly incidental thereto as shown on plans, stated in specifications or reasonably implied there from, all in accordance with the Contract Documents. Scope of Work - scope of the work is, but not limited to as follows: 1. General Construction - Roof Overbuild 2. Plumbing System 3. HVAC System 4. Electrical work 5. All related work

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.