Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

March 19, 2024

March 19, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$1,350,000.00

Public - City

img_map_placeholder

Multiple Locations, Clayton, MO

Subscribe to View Full Documents

The Scope of Work consists of a variable depth removal of the existing asphalt surface in order to correct the crown in the roadway, followed by replacement with a new 2" asphalt overlay for approximately 0.77 miles of roadway and the addition of concrete paver crosswalks. Replacement of underlying concrete slabs may be necessary in isolated locations as conditions require. Existing curb ramps will be replaced in order to bring them into ADA compliance and select signal components will require modification. Striping, traffic control and other items shall be included as shown in the specifications. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid in accordance with the Bidders Checklist. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher. The City of Clayton hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The City of Clayton reserves the right to accept or reject any bid and the waive any irregularities in the best interest of the City. The DBE goal for this project is 12% No 2nd tier subcontracting will be allowed on this project.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.