Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

November 13, 2023

April 30, 2024

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Searcy, AR

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The scope of work entails the plowing and/or removal of snow and/or hardpack from the Historic Boardwalk/Bay Street as needed. It is the Contractor's responsibility to familiarize themselves with the Historic Boardwalk Area/a portion of Bay St. and Water St. and City snow disposal areas for this scope of the work in preparation of their proposal. o The Contractor will plow when snow levels reach three (3) inches of accumulations. o The City Manager may negotiate special conditions to the contract as may be in the best interests of the City. o The Contractor shall be responsible for the inspection of the areas prior to beginning work. o The Contractor shall be responsible for the repair, replacement or reconstruction of any damage to public or private property caused by the contractor. o The Contractor is responsible for and shall include in their quote all cost for equipment, labor, maintenance, fuel, insurance, mobilization and any other cost necessary to perform the work. o The City shall pay for this work on a lump-sum, per job basis. The City reserves the right to change/limit the scope of services Proposals must include the Contractor Proposal Form, the acknowledgement of addenda form, an Alaska Business License, and City of Seldovia Business License. The City reserves the right to reject all bids and reserves the right to waive any formalities, and to negotiate with the low bidder. Following contract award, all parties shall sign a contract and the contractor will be given notice to proceed. The contract period is through approximately April 30, 2024.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.