Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 10, 2023

November 27, 2023

June 1, 2024

8500 Peña Blvd

Site Work

No Information to Display

$410,000.00

Public - County

img_map_placeholder

8500 Peña Blvd, Denver, CO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000330762 Question Acceptance Deadline 10/23/2023 at 10:00 AM MT Questions are submitted online Yes The Aurora Highlands is a New Master Planned Community Located on the High Plains Prairie, Approximately Three Miles South of Denver International Airport (Dia). The Site is Located Within Adams County East of Picadilly Road, South of 56th Avenue, North of 26th Avenue, and West of Powhaton Road (Future Alignment) With a Portion Also East of Powhaton South of 48th Avenue (Future Alignment). The Development Consists of Approximately +/- 3,884.9 Total Acres Which is Anticipated to Be Developed with Single Family and Multi-family Homes, Commercial, Retail, Industrial, and Other Amenities, Reaching an Estimated Population of Approximately 41,823 People at Full Build-out. Aacmd is Responsible for Designing, Constructing, and Managing the Construction of Certain Public Improvements Benefiting the Aurora Highlands, Both Onsite and Offsite. To Learn More About the Aerotropolis Area Coordinating Metropolitan District, Visit: Https://www.aerotropolisdistricts.org As of the Date of This Ifb, the Owner Anticipates That the Onsite Scope of Work Includes (but is Not Necessarily Limited to): the Construction and Installation of Hard and Softscapes for the Filing 12 Tributary, Which Include Plants, Grass, Concrete, and Structural Items Such as Boardwalks and Viewing Decks, Architectural Terraces, and Retaining Walls. More Detailed Information Regarding the Scope of Work Will Be Issued via Addendum. A More Detailed Summary of the Scope of Services to Be Awarded is Set Forth in Exhibit B to the Construction Enclosed as Attachment C; Exhibit B Will Be Issued via Addendum. The Applicable Drawings and Specifications Will Be Issued via Addendum and Marked as Attachment a. In the Event of Conflicts, Inconsistencies, or Discrepancies as Between the Drawings and Specifications, on the One Hand, and the Scope of Work Description, on the Other Hand, the Scope of Work Description Shall Govern and Control. To Learn More About the Aurora Highlands, Visit: Https://theaurorahighlands.com/ All Bidders Are Encouraged to View the Site Before Submitting a Bid. The Site Can Be Viewed by the Public From the Street. The Immediate Stakeholders in This Project Include: The Aurora Highlands Community Authority Boardestablishment (cabea) The Aurora Highlands Community Authority Board; The Aerotropolis Area Coordinating Metropolitandistrict (aacmd), the Aurora Highlands Metropolitandistrict . 1 (district . 1), the Aurora Highlandsmetropolitan District . 2 (district . 2), the Aurora Highlands Metropolitan District . 3 (district . 3), Atec Metropolitan District . 1 (atec . 1), and Atec Metropolitan District . 2 (atec . 2) (Collectively, the cab Districts); The Aerotropolis Regional Transportation Authority(arta); Aurora Highlands, Llc; The City of Aurora; Aurora Public Schools; and Adams County OWNER reserves the right to reject any or all submittals; to review and consider alternates (if any); to waive ANY informalities or irregularities; to further negotiate with one or more Bidder; and to reject any conditional, nonconforming, nonresponsive or unqualified submittals Required Acknowledgement ACKNOWLEDGEMENT OF REVIEW OF ALL DOCUMENTS Acknowledgement that bidder has reviewed all bid documents including Addendums. Status: Accepted by Construction Journal

58 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.