Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 27, 2023

September 22, 2024

313 N Main St

Renovation, Site Work

No Information to Display

$450,000.00

Public - City

img_map_placeholder

313 N Main St, Gordo, AL

Subscribe to View Full Documents

Rehab of the existing treatment building including replacement of windows, doors and new metal roofing, replacement of existing aerator, replacement of chemical feed equipment and piping, complete electrical replacement and upgrade, replace existing vertical turbine pumps, and clear well rehabilitation This project consists of Removal and replacement of existing vertical turbine high service pumps Removal and replacement of existing valves Removal and replacement of existing aerator tower assembly Refurbishment of existing equipment building and replacement of existing chemical and chlorination equipment Installation of diesel engine driven emergency power generator Rehabilitation of existing clear well Installation of an emergency standby power generator at the Downtown WTP location. Contract time shall be 300 consecutive calendar days from the effective date shown in the Notice to Proceed. Liquidated damages will be assessed for each consecutive calendar day thereafter in the amount as specified herein. Bidders must be qualified under Alabama Law to perform the construction activities desired by the Owner and must be registered with the State of Alabam as Licensing Board for General Contractors as appropriate. Furthermore, the successful Bidder, whether a resident or non resident of the State of Alabama, shall be required to comply with all other applicable City, County and State licensing and/or permit laws. Each Bidder must deposit with his proposal a Bid Bond or Certified Check in an amount equal to five percent (5%) of his bid, payable to the Gordo Water, Gas and Sewer Board, as bid security. Bidders shall also submit a current financial statement, if requested by the Owner. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of one hundred percent (100%) of the contract amount. All questions regarding this project should be forwarded to Neel-Schaffer, Inc., Attention: Phillip R. Guin, P.E., email phillip.guin@neel-schaffer.com, or phone at: 205-799-3421. All questions should be received 48 hours prior to bid opening to allow time for addenda, if necessary. The Gordo Water, Gas and Sewer Board reserves the right to reject any and all bids and to waive any informalities or irregularities therein

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.