Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

April 1, 2024

July 8, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,300,000.00

Public - City

img_map_placeholder

Multiple Locations, Wenatchee, WA

Subscribe to View Full Documents

AC Water Main Replacement Projects Site Directions: Multiple roadway locations throughout Wenatchee Installation of new water mains and abandonment of existing Asbestos Cement water mains. Existing water lines and services will be replaced in 1st Street from Wilson to Miller and in Chelan Ave. from Marr to Lincoln. A new water main will be constructed in 8th Street between Miller and Wilson including new hydrants and services. Roadways will be repaved and ADA compliant pedestrian ramps will be built in accordance with the plans and specifications. The project cost is estimated between $1,100,000, and $1,300,000. Work to be performed includes: Installation of approximately 375 feet of 6-inch ductile iron water mains, approximately 1,650 feet of 8-inch ductile iron water mains, replacement or reconnection of 11 customer water services, installation of 28 water services, removal and disposal of 320 feet of 6-inch asbestos-cement pipe, grout filling in-place of 400 feet of 8-inch asbestos cement pipe and 220 feet of 6-inch steel pipe; installation of 9 ADA sidewalk ramps, installation of 5 catch basins, and grinding and overlaying the work areas. Work on existing asbestos-cement pipe will require personnel with proper certifications. PROJECT LOCATION There are three locations on this project: o First Street from North Miller Street to North Wilson Street. o Intersection of South Chelan Avenue and Marr Street. o 8th Street from Ramona Avenue to North Miller Street. Questions regarding the project should be addressed to: Jeremy Hoover, PE City of Wenatchee Phone: (509) 888-3212 Email: jhoover@wenatcheewa.gov Each request for such interpretation should be by email or in writing addressed to City of Wenatchee, 301 Yakima Street, Wenatchee, Washington 98807.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.