Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

January 8, 2024

January 19, 2024

155 E St Charles Rd

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

155 E St Charles Rd, Elmhurst, IL

Subscribe to View Full Documents

The Elmhurst Park District is accepting bids for the following identified project 2024 Kies Recreation Center Flooring Project Bid proposals enclosed in a sealed envelope and clearly marked as 2024 Kies Recreation Center Flooring Project Available Beginning at Noon on Monday, October 2nd, 2023 A bid security in the amount of 10% of the base bid will be required to accompany bid proposals for this project. a. Site Access 7am- 3pm b. Site Usage / Storage District reserves the right to reject any or all bids Question Deadline 10/16/2023 at 1:00 AM CT Address any questions to Joyce Sica Phone: (630) 993-8189 or Email: Jsica@epd.org The object of this project is to replace approximately 3400 square feet of flooring in the gymnasium of the Kies Recreation Center in the gymnasium. This room is used for senior events, basketball, volleyball and hopefully in the future pickleball. o The objective of this project if the installation of approximately 3400 sq ft. of Ecore Baller Motivate Sports Flooring. The District seeks bids from professionally Certified Ecore Athletic Flooring installers only. All shall be done in a lump sum bid. The demolition and disposal of existing surface shall not be included in the bid. Original flooring will be removed and abated by others prior to the new floor installation. Receipt of a certificate of clearance for asbestos remediation will be issued to the Certified Ecore Flooring installer prior to the start of the job. o The Certified Contractor will provide and install leveling/patching compounds, adhesives and prepare sub flooring to provide the proper installation of new Ecore Bounce Sports Flooring. o The Certified Contractor will provide and install Cove Base 4" tall in basic black o Provide moisture testing and PH test of base floor and self-leveling check before installation. o The Certified Contractor will provide and install Transition strips (Basic Black Rubber or Vinyl) for all transition areas. o The Certified Contractor will provide Game Line Paint, Tape Barrier Clean etc., all materials. o The Contractor will be a Certified Specialty Court Line Installer and will provide labor for: 1 basketball court, 1 volleyball court and 2 pickleball linings. Sport Court lining must be painted on the courts. NO line stickers permitted. o Installing company must be located in Illinois. o Service reply time company representative must be on site within 48 hours of service request. o All generated debris to be removed and disposed of properly. o Ecore Flooring materials, Ecore Baller Weld rods, Ecore E Grip and bricks necessary for installation will be provided by Owner The floor will be completely removed and abated prior to the installation work.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects