Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 27, 2023

February 19, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Multiple Locations, Carrollton, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Carrollton is soliciting requests for proposals from interested vendors to provide City citizens who wish to have their sidewalks replaced to address trip hazards. This work will include only that portion within the city right-of-way and up to one panel of the resident's private lead walk to ensure proper elevation of city sidewalk. The Resident will be funding 10% of this program. All responders must submit a Bid Bond on the city form or bonding company's bid bond form based on 5% of respondent's bid total. Please be sure to upload an electronic copy of your bond. The original must be mailed and received by the established due date and time. Question Deadline 10/12/2023 at 10:30 AM CT Technical Support for using this online bidding platform, please contact IonWave via 866-277-2645 Ext 4 or by email: support@ionwave.net. It is the intent of these specifications to describe the types of repairs that may be required during the term of this agreement. Method of payment shall be based on bidder's proposed unit price in accordance with the stated measure for each item. For any bid item which includes the words "replacement of" or "removal and replacement of", the bid price shall include removal and disposition of the existing item. Concrete for sidewalk repair and construction of barrier free ramps shall be 3000 psi compressive strength concrete at 28 days. The bid price shall include all necessary traffic control, reinforcing steel, base preparation, material testing, surveying for grade/drainage verification, joint sealing, clean up, sprinkler repairs, backfilling, concrete, all barricading, and signage. Generally, if the disturbed area outside of the paved location is kept to a minimum (less than six inches), replacement of grass or sod will not be required. If damage occurs, contractor will repair the area with like grass or sod. If the parkway is left low because of the street and/or sidewalk repairs, to the extent that proper drainage is not achieved, the parkway is to be leveled and like sod replaced. When additional backfill material is necessary to level the parkway and is beyond the normally required amount of fill dirt needed, then the contractor may use pay item #8 to cover their additional costs. When sod is required, pay items #9 and #10 are to be used. All traffic control must be in accordance with the details and provisions of the latest version of the TxDOT "Manual on Uniform Traffic Control Devices". All work shall be performed in accordance with City of Carrollton Public Works General Design Standard Specifications and Detail sheets

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.