Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 1, 2024

August 5, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$17,630,000.00

Public - City

img_map_placeholder

Multiple Locations, Pomona, CA

Subscribe to View Full Documents

The City of Pomona (the City) is soliciting bids from firms for Pomona Multi-Neighborhood Pedestrian and Bicycle Improvement Project No. 428-67930 Federal No. ATPL-5070(035) IFB NO: 2023-46. The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required in the specifications and contract documents located in Documents and Attachments tab. Submitted bid may be withdrawn at any time prior to the due date and time. No bid may be withdrawn after the due date and time. All work to be done under this contract shall be completed within ; 150 working days for all the base bid work; and 75 working days for all the additive alternate work (if awarded); Conditional Notice to Proceed (NTP) is expected to be issued in January 2024; Potholing shall commence after Conditional NTP is issued and shall be completed within 20 Working Days; Working days that occur during Summer 2024 and Summer 2025 months shall be counted as consecutive days excepting for City Holidays; All other work during non-summer months shall be tolled following Citys approved phasing schedule from Contractor., and if only a portion of the additive alternate work is awarded the allowed additive alternate working days will be prorated based on the dollar amount) beginning on the date stipulated in the written "Notice to Proceed" issued by the City Engineer Type of Award: Lump Sum Pre-Bid Meeting: No Online Q&A: Yes Q&A Deadline:10/18/2023 3:00 PM (PDT) Each bid must be accompanied by cash or by a cashiers or certified check or by a bid bond in the amount of ten percent (10%) of the amount of bid price payable to the City of Pomona as a guarantee that the bidder, if their bid is accepted, shall promptly execute the contract, secure payment of workman's compensation insurance and furnish all required bonds, as identified herein. If submitting cash, cashiers or certified check, it must be delivered to Public Works before the close of the bid. If the proposer is using a bid bond, please submit it in File 1 of your response (pg. 10). Upon award, the selected vendor will need to furnish the original bid bond to the Public Works Department.

67 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.