Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

November 13, 2023

December 15, 2023

Multiple Locations

Site Work

No Information to Display

$77,050.00

Public - City

img_map_placeholder

Multiple Locations, Fannystelle, MB

Subscribe to View Full Documents

* Award subject to final approval. The community of Ste. Agathe is protected by a clay ring dyke. Summer rainfall is conveyed through the ring dyke via gravity drainage infrastructure. Spring snowmelt and rainfall runoff is pumped out of the ring dyke when high river levels prevent gravity drainage. Five (5) valve chambers and three (3) gravity structure gate chambers are closed to prevent flooding in Ste. Agathe during high river levels. Gravity structure gate chambers are comprised of a cast-in-place concrete chamber with a concrete divider wall. The gravity structure gate chambers contain a flap gate and a sluice gate. During a recent condition assessment inspection, AECOM identified damaged concrete at Gravity Structure 2 (GS-2). The concrete damage appears to have been created by concrete anchors installed near the edge of the concrete divider wall, causing portions of the concrete to pop. The released anchor bolts have subsequently caused misalignment of the sluice gate operator stem and difficulty operating the sluice gate. To repair damaged concrete, the existing grating must be removed. After concrete repairs are completed, the grating can be replaced at a slightly lower elevation to remain within competent concrete. Then the sluice gate and valve stem operator must be repaired, realigned, and shortened to fit with the lowered grating. A cash allowance has been included to cover unknown material costs associated with the sluice gate repairs. The work includes the following: - Remove sluice gate operator, existing grating, structural beams, and concrete attachments. - Inject cracks within the concrete divider wall with epoxy. - Sawcut, chip out, pressure wash, and repair damaged concrete on divider wall. - Inspect and repair existing sluice gate, guides, supports, stops, bolts, nuts, etc. - Re-install existing grating, structural beams, and concrete attachments 150 mm lower than existing. - Re-install sluice gate operator at 150 mm lower deck and ensure proper sluice gate operation. The Work is fully detailed in the reference documents on the following page of this Tender. Question Acceptance Deadline : 2023/10/10 12:00:00 PM CDT Questions are submitted online : No Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.