Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 25, 2024

May 15, 2024

June 10, 2024

Edes Ave & Hale Ave

Site Work

No Information to Display

$2,896,300.00

Public - City

img_map_placeholder

Edes Ave & Hale Ave, Oakland, CA

17

5

2

3

Subscribe to View Full Documents

**As of November 15, 2023, project is on hold. No definite date for the rebid.** The work to be done under this contract includes the installation of the Contech Dual Stage Hydrodynamic Separator (DSBB 11-24-144) and the diversion system at the location on Cary Avenue between Hale Avenue and Edes Avenue in the City of Oakland as shown on the Plans and specified in these Specifications. The DSBB will be furnished by the City. The Contractor shall coordinate with the DSBB manufacturer for the delivery of DSBB to the jobsite, and shall be responsible for off-loading and installing the DSBB and appurtenances. The work shall include, but not limited to, mobilization, traffic control, temporary fencing and barricade, clearing and grubbing, water pollution control, dust control, control of ground and storm drain waters, construction survey and staking, installation of shoring system; removal and disposal of existing concrete box culvert; replacement of existing sanitary sewer line; removal and replacement of existing concrete and asphalt concrete pavements, sidewalks, driveways, curbs and gutters where required, saw cutting; installation of signage; removal and disposal of debris and materials, conducting soil testing, excavation of existing soil, disposal of excavated materials, preparation of subgrade, supplying and placement of structure base materials and pipe bedding materials; structure excavation and backfill; trench excavation and backfill; roadway excavation and backfill; furnishing and installation of materials and components of the storm water treatment unit, sump, riser, manhole/access hatches; supplying and placement of structural concrete, junction boxes, weir wall; installing 60" RCP piping; furnishing and installation of manholes, manhole frames and covers; furnishing and placement of imported backfill materials, permanent and temporary resurfacing, protection of existing facilities and utilities; fence/metal railing replacement, as well as furnishing and installation of the associated appurtenances necessary or required to satisfactorily complete the work as shown on the Plans and required in these Specifications. Questions Due: October 13, 2023 by 2:00 PM by email to the Project Manager. It is the Contractors responsibility to ensure that the email is received by the Project Manager The work to be done under this contract includes the installation of the Dual Stage Hydrodynamic Separator (DSBB) (to be furnished by the City) and the diversion system at the location on Cary Avenue between Hale Avenue and Edes Avenue in the City of Oakland as shown on the Plans and specified in these Specifications. The work embraced herein shall be done in accordance with these project specifications and drawings (if any), including, but not limited to, the "Standard Specifications for Public Works Construction 2015 Edition" (GREENBOOK), the "Standard Details for Public Works Construction 2002 Edition", and the State of California, Department of Transportation, Standard Specifications and Standard Plans, dated 2010, when applicable for certain applicable State Standard drawings that are specified herein. All documents, City of Oakland programs, policies and regulations referenced herein are incorporated as if attached hereto or herein repeated. The work to be done under this contract includes the installation of the Dual Stage Hydrodynamic Separator (DSBB) (to be furnished by the City) and the diversion system at the location on Cary Avenue between Hale Avenue and Edes Avenue in the City of Oakland Questions Due : January 18, 2024

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.