Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

June 30, 2024

Eberlein Ave

Paving, Site Work

No Information to Display

$885,885.00

Public - City

img_map_placeholder

Eberlein Ave, Klamath Falls, OR

Subscribe to View Full Documents

Maoyina Heights Water Transmission Main Complete and submit the included Bid Booklet with the accompanying documentation. Subcontractor Disclosure forms must be submitted prior to 4:00 P.M. PST on the same date. All questions regarding the Plans and Specifications must be submitted to Andrew Lakey, P.E., in written form through email at alakey@klamathfalls.city, on or before 12:00 P.M. 10/13/2023 by registered plan holders only. If in the judgement of the Engineer, additional information or interpretation is necessary such information will be supplied in the form of an Addendum only plan holders who are listed on the City's plan holders list will be notified by email of the Addendum. Award of Contract will not be final until the later of 1) City Council Contract Award, or 2) the City of Klamath Falls provides a written response to each timely protest, denying the protest and affirming the Award. On all Projects, Work performed by the Contractors own organization must be at least 30% of the awarded Contract Amount. Written or verbal questions by plan holders Subcontractors who are not on the plan holders list will not be addressed. The Project will be a public improvement Project subject to ORS 279C.800 to 279C.870, Prevailing Wage Rates A copy of the rates may be obtained Electronically ENGINEERS ESTIMATE RANGE: $900,000 to $1,000,000. Work shall include, but not necessarily be limited to: Construction of approximately 2,400 LF of 12-inch C900 PVC water transmission main within Eberlein Avenue, installation of fire hydrant assemblies, connections to existing water main and water booster station building, cold plane pavement removal, and asphaltic concrete paving. Bidders must identify whether they are a Resident Bidder as defined in ORS 279A.120 (Preference for Oregon goods and services). The City of Klamath Falls may not receive or consider a Bid for a public improvement Contract unless the Bidder is licensed by the Oregon Construction Contractors Board. Contractors or Subcontractors working with asbestos cement Materials must be licensed according to ORS 468A.720 (Qualifications for license) The City of Klamath Falls may reject any Bid that does not comply with prescribed public contracting procedures and requirements, including the requirement to demonstrate the Bidders responsibility under ORS 279C.375 (Award and execution of Contract) (3)(b), and that the contracting agency may reject for good cause all Bids after finding that doing so is in the public interest. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The company name "Bob's Excavating " , was Awarded

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects