Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

November 13, 2023

March 31, 2024

Multiple Locations

Site Work

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Fort St. John, BC

Our team is requesting plans for this project.

Subscribe to View Full Documents

The project includes installation of pipe culverts, excavation/ditching and riprap end protection, placement of grout in abandoned previously used CSP culverts, and hydraulic seeding of disturbed areas. The sites are located between Km 228.80 to 367.20 of the Alaska Highway between Fort St. John and Fort Nelson, BC. For reference, Dawson Creek is at Km 0, Fort St. John is at approximately Km 75, Fort Nelson is at approximately Km 455, and Watson Lake is at approximately Km 986 on the Alaska Highway. The work under this contract generally comprises of the following (including Optional Work which may not be undertaken by PSPC) but is not limited to: 1. Contract submittals (using “CentralCollab”) prior to and during the work (see 3.7 – Contract Submittals, Section 01 25 20 – Mobilization and Demobilization and Section 01 33 00 – Submittal Procedures). 2. Supply and maintain of all traffic control for the duration of the works. 3. Quality Management. 4. Development of construction access and temporary earthworks to facilitate construction (during winter conditions and frozen ground as applicable). Restoration of the disturbed areas to pre-construction conditions following the construction. 5. Installation of various sized diameter Steel Pipe Culverts using trenchless technologies (during winter conditions and frozen ground as applicable). Culvert installation via cut and cover construction techniques will not be accepted. 6. Removal and onsite disposal of waste material from the inside of the installed culverts. 7. Culvert ditching including excavation, transport, and disposal of excess material (waste) onsite. 8. Culvert end protection including supply and installation of riprap and bentonite. 9. Decommissioning of existing culverts via supply and placement of grout inside the abandoned culvert. 10. Hydraulic Seeding of disturbed areas. 11. Surveys (construction layout, payment quantities, as-built survey, and others as required). 12. Environmental protection. 13. Work completed by Change Order (if required and approved by Departmental Representative). Location: Km 228-367 Drainage Improvements, Alaska Highway (Highway 97) in Northern British Columbia To assist with bonding and insurance requirements, this project is estimated to cost approximately between $1,000,001 to $5,000,000. Please contact the contracting officer to get the full solicitation documentation, access information on how to bid, or if you have any questions regarding this tender opportunity.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.