Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 1, 2023

No Information to Display

245 Farrell Ave

Renovation, Site Work

No Information to Display

$1,500,000.00

Public - City

img_map_placeholder

245 Farrell Ave, Gilroy, CA

Subscribe to View Full Documents

A. Furnish all labor, materials, equipment, facilities, transportation and services to complete tree protection and related work as shown on the drawings and/or specified herein. B. Description of Work: 1. Protection of existing trees and vegetation to remain. 2. Trimming of existing trees. 3. Maintenance of existing trees and vegetation during construction. 4. Removal of existing trees and other vegetation. 5. Contractor shall retain the services of a certified arborist to perform work and/or make recommendations under conditions specified herein. C. Traffic: 1. Do not interfere with or close public ways without permission of the Owner's Representative. 2. Do not interfere with adjacent private properties without permission of the Owner's Representative. D. Site Utilities: 1. Advise utility companies of excavation activities before starting excavations. 2. Locate and identify underground utilities passing through work area before starting work. 3. In event unidentified underground utilities are encountered during work, advise utility owner immediately before proceeding. Add any new utility information to project record drawings for actual location. 4. Protect all existing-to-remain utilities. 5. Do not interrupt existing utilities without advance notice to and approval from the Owner Relocation of Districts surplus modular buildings (one - 72x40), playground surfacing, playground equipment, fabric shade structure, and site work to Antonio Del Buono Elementary to create a new preschool hub. Deadline for MEP subs to submit questions related to the Project: October 11, 2023 @ 2 pm Bids/RFI responses to questions: October 16, 2023 Prequalified Questionnaire due: October 18, 2023 @ 2 pm Announcement of prequalified subs: October 19, 2023 @ 2pm Planned Announcement of Evaluation Criteria Ranking: November 9, 2023

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.