Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

March 11, 2024

June 28, 2024

105 W Court St

Renovation

No Information to Display

$393,000.00

Public - State/Provincial

img_map_placeholder

105 W Court St, Iowa City, IA

Subscribe to View Full Documents

LAUNDRY BUILDING - RAZE STRUCTURE The certified Iowa TSB participation goal for this project is 10 percent (10%) of the Base Bid. This establishes the amount that should be reported on the Final Payment Reporting Form as part of the TSB Program. If there are any questions, please contact UI Design & Contraction Chet Wieland, Project Manager - (319) 335-5500 are of Project Work Site: 1) Debris Removal: i. Debris shall be removed via ensured, safe route. 2) Temporary Barriers: Not Applicable. b. Security: 1) Provide security and facilities to protect Work, existing facilities, and Owner's operations from unauthorized entry, vandalism, or theft. 2) Access to the project site shall be coordinated with Owner's security program. c. Access, Deliveries and Debris Removal: d. Parking: 1) Parking for two (2) construction vehicles will be available in Lot 64. The Constructor shall contact Parking Services at (319-335-1475), located at the West Campus Transportation Center, 840 Evashevski Drive, to obtain temporary permits following preconstruction meeting. Any costs associated with parking shall be paid by the Constructor. No parking is available at the project for employee vehicles. e. Project Fencing Requirements: 1) Fencing requirements, as indicated on Drawings, shall be constructed of 9 or 11-gauge chain link not less than six (6) feet in height and not more than 2-inch mesh supported with posts spaced not more than ten (10) feet apart and all corner and gate posts imbedded in concrete. All other posts shall be sufficiently secured in ground to maintain proper and adequate support of fence. Fenced in area shall have at least two (2) access gates and all gates shall be lockable. 2) Using existing landmarks, lamp poles, trees or other Owner property for support of fencing is strictly prohibited unless a written waiver is obtained from Owner's Representative. 3) Uses of ribbon, snow fence, chicken wire, rebar, rope, and wooden barricades as fencing is prohibited. 4) Fencing shall be maintained by the Constructor in an "as-installed" condition throughout the life of the project. 5) The Constructor may use used fencing provided it is in good condition and is satisfactory to the Owner.

32 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects