Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

November 13, 2023

No Information to Display

3200 Perkins St

Renovation

No Information to Display

$414,000.00

Public - City

img_map_placeholder

3200 Perkins St, Saginaw, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

SCOPE OF SERVICES Claytor Sisd Saginaw County Head Start Boiler Replacement Project includes the base bid work for removal of (2) existing boilers and installation of (2) new high efficiency boilers and new boiler circulating pumps. The existing expansion tanks, air separator and system circulating pumps will remain in use. An alternate price shall be provided to retube the existing Burnham Boiler. The (2) existing boilers will remain with only the Burnham Boiler to be operational in this alternate pricing. The Owner has sent a letter of intent for (2) new Aerco Boilers and the (2) new boiler circulating pumps to be put on hold for this project. They are currently waiting for the Contractor to be selected and are immediately available. The Contractors shall include all costs to purchase this equipment. All questions and correspondence should be directed to Craig Veldkamp or Ron Moulton via email to cveldkamp@macmillanassociates.com or rmoulton@macmillanassociates.com by telephone at 989-894-4300. In order to ensure consistency of information provided regarding this RFP, contact with Saginaw Public School District personnel other than Mr. Craig Veldkamp or Ron Moulton is discouraged and may be grounds for elimination from the selection process. WITHDRAWAL OF PROPOSALS: Proposals shall remain valid for a period of sixty (60) days after submission. Modifications to proposals will not be accepted by the district, except as may be mutually agreed upon following the acceptance of the proposal..

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.