Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

November 30, 2023

September 5, 2024

5707 Morriss Rd

Renovation

No Information to Display

$600,000.00

Public - City

img_map_placeholder

5707 Morriss Rd, Flower Mound, TX

Subscribe to View Full Documents

QUESTIONS: October 17, 2023 and 12:00 PM ANSWERS: October 17, 2023 through October 19, 2023 at 4 PM. A Proposal Bond from a bonding company acceptable to the Owner or a certified check in an amount equal to 5 percent (5%) of the greatest amount of proposal must accompany each offeror's proposal. A Payment Bond and Performance Bond, each in an amount equal to 100 percent (100%) of the Contract Sum conditioned upon the faithful performance of the Contract will be required. Please note that all bonding companies presented must be acceptable to the Owner. All proposals must be in the hands of the Owner no later than the time specified above. Please seal all proposals in duplicate in an envelope with the following information on the face of the envelope. Name of Offeror (General Contractor) Marcus H.S. Food Service Equipment Replacements and Renovations The Owner reserves the right to reject any and all proposals and to waive any irregularities in the Competitive Sealed Proposal process. No proposal shall be withdrawn within 45 days after the proposal opening without the specific consent of the Owner. The prevailing rates of wages are the minimums that must be paid in conformance with all applicable laws of the State of Texas. All Offerors submitting a proposal are encouraged to attend the proposal opening. Subcontractors and suppliers intending to submit proposals to Construction Offerors are required to prepare their proposals based on a complete set of proposal documents. If after reviewing the complete set of proposal documents, Subcontractors and supplier offerors desire to purchase individual drawings and specification sections for their proposal convenience, they may do so by ordering the specific drawings and specifications directly from the reproduction company. Each offeror purchasing a partial set of proposal documents is responsible for determining exactly which documents he requires and is responsible for all costs associated with printing and delivery. Subcontractors and suppliers exercising this option must agree to do so on the basis that 1) all documents shall be returned to the Architect, without refund, after submitting a proposal and 2) documents shall not be used on other projects. Successful Subcontractors and supplier offerors may retain their Proposal Documents until completion of the construction. Proposers shall submit questions about the Proposal Documents to the Architect in writing not later than ten days prior to the date of receipt of the proposals. Replies will be issued to proposers as an addendum to the Proposal Documents and shall become a part of the Contract. The Architect and Owner will not be responsible for oral clarification.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.