Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

March 1, 2024

December 31, 2024

1002 N Yondota Rd

Site Work

No Information to Display

$2,761,057.00

Public - City

img_map_placeholder

1002 N Yondota Rd, Curtice, OH

Subscribe to View Full Documents

The work to be performed under this Contract generally consists of the removal and replacement of the existing permanganate feed system piping at the Collins Park WTP Low Service Pumping Station, 1002 N. Yondota Rd, Curtice, Ohio. The work to be complete includes the removal of the existing 3-in HPDE piping including accessories and existing diffuser rings at the Intake Crib. The contractor will also reconfigure the process piping within the Surge Well and replace the filters and drain piping for the existing strainers in the Permanganate Building. The completed project will include the installation of three 3-in Steel Reinforced HDPE pipelines from the Surge Well to the Intake Crib, including associated mounting brackets and accessories. The approximate distance between the Surge Well and Intake Crib is 15,493 linear feet. The Contractor will be required to provide 48,807 linear feet of steel reinforced HDPE pipe and approximately 295 linear feet of stainless steel braided hose. Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 10/10/2023 4:00 PM (EDT) License Requirements Contractor's Preferences MBE - Minority-Owned Business Enterprise WBE - Woman-Owned Business Enterprise Project Duration Substantial completion by 10-31-24. Final completion by 12-31-24. Prevailing Wages are required for this project. It is the obligation of a contractor or subcontractor to make payment in accordance with the prevailing wage determinations.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects