Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

No Information to Display

217 E Main St

Renovation

No Information to Display

$1,816,000.00

Public - County

img_map_placeholder

217 E Main St, Sevierville, TN

Subscribe to View Full Documents

PROJECT DESCRIPTION A NEW APPROXIMATELY 50,000 S.F. WAREHOUSE AND FUEL STATION FOR SEVIER COUNTY ELECTRIC SYSTEM. Each bid must be accompanied by a Bid Security in the form of a Cashiers Check or a Bidders Bond, executed by the bidder and a surety company in the sum of not less than five percent (5%) of the total amount of the bid including all additive alternates, as a guarantee that, if the bid is accepted, the required contract will be executed and the required performance and payment bonds furnished. Bid Bond shall be executed on AIA Document A310. Said bond will be returned to the unsuccessful bidders as soon as the contract has been awarded and the successful bidder has executed the contract and furnished the necessary bonds and the contract has been executed by the Owner. Such bond shall be from a surety Company authorized to transact business in the State of Tennessee and Company shall be registered in Federal Register, Department of the Treasury, Fiscal Service, Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies; Notice. Attorneys in Fact who sign any bonds must file with each instrument a certified and effective dated copy of their power of attorney. The successful bidder will be required to execute a performance bond in an amount equal to one hundred percent (100%) of the Contract Sum and a payment bond covering and including labor and materials in an amount equal to one hundred percent (100%) of the Contract Sum. Performance and Labor and Material Payment Bond shall be on AIA Form A312. Upon award of the construction contract to the successful bidder, construction shall commence on a date to be specified in the Notice to Proceed to the Contractor and shall be completed on or before the completion date specified in the Contract Documents as time is of the essence in the performance of the contract for construction. Upon receipt of Notice to Proceed, the Contractor will complete the work regularly, diligently, and uninterruptedly at such rate of progress as will ensure full completion thereof within the time specified on the Bid Form. The Owner reserves the right to waive any information in or to reject any or all bids and to accept the bid deemed favorable to the interest of the Owner.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.