Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 1, 2024

No Information to Display

Cave Mill Rd

Paving, Site Work

No Information to Display

$1,860,000.00

Public - City

img_map_placeholder

Cave Mill Rd, Bowling Green, KY

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The portion of Cave Mill Road in need of capacity and safety improvements is currently a 2-lane rural roadway section that is located partially within the City Limits, but primarily in the County. Improvements to this 1.5 mile stretch of roadway would be necessary beginning near the intersection of Grider Pond Road and continuing west to the intersection of Dishman Lane. Cave Mill Road, on each end of this corridor, has been widened in recent years adding much needed capacity and safety, especially at access points. Cave Mill Road has long been a major collector, however, given residential and commercial growth on both ends, capacity is becoming a greater concern. Additionally, Natcher Elementary is located midway along this roadway. There are no dedicated turn lanes which present safety and congestion issues for both school buses and the traveling public at peak hours. For these reasons Cave Mill Road was included in the Kentucky Transportation Cabinet's (KYTC) Roadway Plan with design funds for the biennium. A total of $1,860,000 is provided by KYTC in state reimbursable funds to the City of Bowling Green to be used to reduce congestions and increase safety on this portion of Cave Mill Road. Design work and necessary property acquisition will commence in FY2023. At present, there is no funding designated from the state for construction beyond this initial amount. project pulled from CIP document capital improvement plan FY-2022-2026 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.