Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 20, 2023

November 21, 2023

August 1, 2024

1280 Cedar Creek Road

Site Work

No Information to Display

$250,000.00

Public - City

img_map_placeholder

1280 Cedar Creek Road, Slinger, WI

Subscribe to View Full Documents

Project involves the installation of storm water improvements at the Slinger Speedway site, including excavation and grading for an infiltration basin, 1,090 LF of ditching, 385 LF of storm sewer installation, manholes and end sections, 1,890 LF of underdrain pipe installation and cleanouts, 112 LF of culvert installation and end sections, clearing and grubbing, erosion control, and restoration. The Project Manager for this Project is Greg R. Calhoun, P.E., who may be contacted at Ruekert & Mielke, Inc., W233 N2080 Ridgeview Parkway, Waukesha, WI 53188- 1020, (262) 542-5733, regarding the Project. Partial sets of Bidding Documents are not available. Neither Owner, Engineer nor Issuing Office is responsible for full or partial sets of Bidding Documents, including any Addenda, obtained from other sources. The cost of Bidding Documents is non-refundable. Each entity obtaining Bidding Documents from the Issuing Office will be designated as a Plan Holder of Record. Bids received from entities who are not Plan Holders of Record may be returned as being nonresponsive. A Bidder's qualification statement must be delivered to Village of Slinger at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to Village of Slinger equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Village of Slinger as liquidated damages. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Slinger re- serves the right to accept the most advantageous Bid, or to reject any & all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. Village of Slinger Margaret Wilber Administrator RUEKERT & MIELKE, INC. W233 N2080 Ridgeview Pkwy Waukesha, WI 53188-1020 Phone: (262) 542-5733 Fax: (262) 542-5631. The Project for which the Work under the Contract Documents is a part is generally described as follows: Slinger Speedway Drainage Improvements Contractor shall complete all Work as specified or indicated in the Contract Documents. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all Plan Holder's of Record. Questions received from Bidders that do not, in Engineer's opinion, allow sufficient time to respond prior to the date for opening of Bids will not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.