Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 31, 2023
January 2, 2024
August 21, 2025
US-113 & State Rd 20
Paving, Site Work
No Information to Display
$25,000,000.00
Public - State/Provincial
US-113 & State Rd 20, Millsboro, DE
The improvements consist of furnishing all labor and materials for this project. The scope consists of a grade separation at the US 113/ SR 20 intersection located just north of Millsboro, Delaware. The grade separation includes a partial cloverleaf configuration with loop ramps in the northeast and southwest quadrants with signals at the ramp terminals, a bridge structure, drainage improvements, and multimodal facilities. Also, unsignalized median crossovers will be removed on US 113 south of the US 113/ SR 20 intersection within the project's limits. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. Pre-bid meeting: no Ojt trainees: two (2) see prospective bidder's notes and posted ojt manual for details. Location: sussex county These improvements are more specifically shown on the location map(s) of the attached plans. Completion time: all work on this contract must be complete within 597 calendar days. Extensions of contract time due to weather are specified in the standard specifications section 108.7f, weather days. It is estimated a notice to proceed is issued such that work starts on or about January 2, 2024. Question Deadline 10/18/2023 at 2:00 PM ET QUESTIONS: E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Surety bond - each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. Performance-based rating system - 29 del.C. 6962 (c)(12)(a) requires deldot to include a performance-based rating system for contractors. The performance rating for each contractor shall be used as a prequalification to bid at the time of bid. Refer to 'general notices' for details. DEDOT - US 113 at SR 20 Grade Separated Intersection CFDA: 20.205
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Millsboro, DE
--
Millsboro, DE
--
Dover, DE
Bid Date: Nov 09 2023
Dover, DE
Bid Date: Oct 19 2023
New Castle, DE
Bid Date: Nov 28 2023
Dover, DE
Bid Date: Nov 07 2023
Dover, DE
Bid Date: Oct 11 2023
Bethany Beach, DE
Bid Date: Aug 07 2023
Dover, DE
Bid Date: Sep 08 2023
Seaford, DE
Bid Date: Sep 06 2023
Seaford, DE
Bid Date: Aug 16 2023
Newark, DE
--
Rehoboth Beach, DE
Bid Date: Aug 31 2023
Felton, DE
Bid Date: Nov 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
