Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 25, 2023
November 24, 2023
August 30, 2024
74 Edgewood Dr
Renovation
No Information to Display
$400,000.00
Public - County
74 Edgewood Dr, Stanleytown, VA
The Henry County Public Schools solicit firms to submit Bids for HVAC Unit Replacements at Stanleytown Elementary School. A Bid Bond and Contract Security will be required of all bidders regardless of amount. Bidders shall be required to bind their bid for 30 days. The Owner reserves the right to reject any and all bids and/or to waive any informality in the bidding procedures. A vendor may not be awarded this bid if they have outstanding pending issues and if they have a project that is three months or greater past the original final completion due date on a current project with Henry County Public Schools. The contract for the project shall be awarded on a lump sum basis of the Base Bid. Alternates chosen at the owners discretion and in any order. Federal prevailing wage rates will be required for this project. Contractor registration in accordance with Section 54.1-1103 of the Code of Virginia is required All work shown on drawings and/or called for in these specifications shall be performed under the General Contract, unless specifically noted to the contrary in the Contract Documents.The project is generally described as the HVAC replacements for Stanleytown Elementary Schools B. The General Contractor shall be: 1. Responsible for the general management of the project. 2. Responsible for hiring all subcontractors. 3. The sole arbitrator of the division of work of all trades, including the patching, repairing and repainting of existing surfaces that may be damaged by work under this contract. Repair to match surrounding surfaces. C. The General Contractor shall coordinate the work of all trades. He shall coordinate all submittals and deliveries for his own work as well as for all subcontractors so as to avoid delays in the progress of the work. He is especially cautioned to examine the structural, mechanical, plumbing and electrical drawings as much of the information indicated therein is not repeated in the architectural documents. D. The General Contractor shall coordinate construction operations included under various sections that depend on each other for proper installation, connection and operation. Schedule construction operations in sequence required to obtain best results where installation of one part of work depends on installation of other components before or after its own installation. Coordinate installation of different components to assure maximum accessibility for required maintenance, service and repair. Make proper provisions to accommodate items scheduled for later installation. E. The General Contractor shall coordinate construction operations to assure that said operations are carried out with consideration given to conservation of energy, water and materials. F. The General Contractor shall require the installer of each major component to inspect both the substrate and conditions under which work will be performed. Do not permit work to proceed until unsatisfactory conditions have been corrected in an acceptable manner
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Sutherland, VA
Bid Date: Oct 31 2023
Hunter Mill, VA
--
Madison Heights, VA
--
Tazewell, VA
Bid Date: Nov 06 2023
McGaheysville, VA
Bid Date: Nov 15 2023
Warrenton, VA
Bid Date: Oct 31 2023
Richmond, VA
Bid Date: Nov 21 2023
Danville, VA
Bid Date: Oct 25 2023
Ashburn, VA
--
Roanoke, VA
Bid Date: Aug 31 2023
Norfolk, VA
Bid Date: Dec 06 2023
Toms Brook, VA
Bid Date: Oct 23 2023
Lawrenceville, VA
Bid Date: Nov 02 2023
Lancaster, VA
Bid Date: Oct 20 2023
Alexandria, VA
Bid Date: Jun 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
