Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 1, 2024

No Information to Display

Westen St

Paving, Site Work

No Information to Display

$1,200,000.00

Public - City

img_map_placeholder

Westen St, Bowling Green, KY

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project is to fund design, property acquisition, and construction of residential roundabouts at potentially three to four of the intersections along Westen Avenue; at the intersections with Rockingham Avenue, Patrick Way, Highland Way, and Ashley Circle. Given the success of the neighborhood roundabouts completed in FY2020, the decision was made to evaluate other locations within the City where traffic flow could be improved with the installation of smaller roundabouts in residential areas. The locations selected will provide better traffic flow for motorists along Westen Avenue by eliminating the need for the stop signs at all four locations. In addition, the roundabouts will provide traffic calming along Westen Avenue by reducing speeds as well as provide pedestrians a safer location to cross both roadways at each of the intersections. FY2022 - Funds were allocated in the amount of $75,000 for the design for all four intersections. Additionally, $745,000 was requested in FY2022 for construction of the Rockingham roundabout in order to take advantage of reduced BGHS traffic during summer months FY2023 - For construction of the remaining roundabouts at Patrick Way, Highland Way, and Ashley Circle a total of $1,200,000 was budgeted to complete property acquistion and construction at these locations. As of October 19, 2023, the project is included in the City's 2022-2026 Capital Improvement Program (CIP). Project is funded for FY2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.