Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 30, 2023

July 1, 2024

November 17, 2028

I-75

Paving, Site Work

No Information to Display

$168,279,578.00

Public - State/Provincial

img_map_placeholder

I-75, North Port, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project Number: 420613-2-56-02 Prequalification Requirements : Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Selection Method : Adjusted Score Response Requested : Letter of Interest Maximum Number of Pages : 10 Project Description : I-75 (SR 93) at Fruitville Road/CR 780 Project Manager : Joe Lauk Contract Amount/Limit : $168,279,578.00 The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the I-75 at Fruitville Road interchange in Sarasota County that proposes to reconfigure the interchange into a Diverging Diamond Interchange to accommodate traffic operations, mobility and safety. Scope efforts include construction of Roadway, Drainage, Structures, Signing and Pavement Marking (S&PM), Lighting, Signalization, Intelligent Transportation System (ITS) and Landscaping Estimated Contract Time: 1,600 Days Financial Management Number: 420613-2-52-01; 420613-2-56-01 The method of contractor selection has not been determined at this time. FLDOT - RFP D/B - I-75 (SR 93) at Fruitville Road/CR 780 420613-2-56-02 Question and Answer Written Response occurs, per the Schedule of Events section of this RFP. The Department will terminate the page-turn meeting promptly at the end of the allotted time. The Department will record all of the page-turn meetings. The Department will provide all proposed questionsto each Design-Build Firm asit relatesto their Technical Proposal approximately 1 (one) week before the written Q & A letter is due.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects