Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2023

May 15, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$110,000.00

Public - City

img_map_placeholder

Multiple Locations, Vernon Hills, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Furnishing professional engineering services for the Centennial Crossing Pond Retaining Wall project roject Description Centennial Crossing pond is a Village owned facility at Fairway Dr. and Rt. 45 in the Village of Vernon Hills. The pond contains three individual sections of retaining walls that are currently failing. The Village is requesting proposals for professional engineering services to evaluate the extent of damage, create a repair or replacement strategy, and design detailed construction documents for the implementation of the selected improvements. Scope of Services Topographic survey as necessary for the design of detailed construction documents Geotechnical and environmental services necessary for retaining wall design and CCDD certification Preparation of all necessary construction documents including plans, specifications, and cost estimates for the repair or replacement of the failing retaining walls. Plans should include: o Civil engineering and site grading o Structural wall details o Landscaping and restoration plans o Soil Erosion and Sediment Control Permitting services for all applicable permits including IEPA and Lake County SMC Construction administration services including o RFI and submittal approval o Pre-Construction meeting attendance o Punchlist development and final walkthrough support Schedule The following schedule is tentative and subject to change during the project planning phase. October 17, 2023 - Project Award at Village Board December 1, 2023 - Concept Plan and Budgetary Cost Estimate Complete March 15, 2024 - Final Contract Documents Complete May 1, 2024 - Construction Permits Received May 15, 2024 - Construction Start

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.