Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 26, 2023
November 27, 2023
April 29, 2024
Multiple Locations
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - State/Provincial
Multiple Locations, Cranbrook, BC
We’ve obtained documents for this project and are currently processing them.
The Contractor shall provide the following Services: (a) Sanding of Hartley Creek FSR (~0km mark to ~1.2km mark). This section of the FSR is high risk due to the steep road grades, tight corners, and steep drop-offs that are present on this section of the FSR. Due to this higher risk, sanding may be required more frequently than the other section of this FSR. A higher volume of sand might also need to be applied on this section, than the other section of the FSR. This is to ensure the safety of all road users of this section of FSR. See Appendix I to reference specific sections of the road to be sanded. (b) Sanding of Hartley Creek FSR (~1.2km mark to ~3.3km mark at the Snowmobile Parking Lot). This section of the FSR is lower risk due to more gentle road grades and thus may not need to be sanded as frequently. This section should only be sanded when it is required to ensure safety of its road users. (c) See the attached Hartley Creek FSR Sanding Location Map for details on the location of the sections of this FSR. (d) The Contractor must carry out the Services in a timely manner, as the Sanding is necessary for rural residents to access their properties. (e) Sanding services must only be completed by the Contractor when the road surface becomes a safety concern due to icy road surface conditions, or otherwise approved by the contract manager. (f) It should be noted that the first 1.3km of the Hartley Creek FSR has steep road grades (averaging 12% with a pitch of 16% at the 1km switchback). This road is also narrow and has high traffic levels at times. These factors may slow down sanding production/services. (g) Due to the steep road grade sections of the road, a pilot truck is required for safety reasons when sanding the steep road grade sections, to ensure the public driving the road are kept safe by being stopped during the sanding services on these sections. The pilot truck is to stop traffic at the top of steep grade section of the road while the sanding truck is sanding the steep grade section of road. (h) Due to the steep road grade sections of the road, it is hard for the sanding truck to get traction. When sanding these steep road grades, it is recommended that the sanding truck backs up the road (drives in reverse) to enable the wheels to be on the sand when sanding. This will ensure the sanding truck does not slide off the road. (i) It may be requested that only the lower or upper sections of the FSR are sanded. This request will be related to the road conditions at the time of the request. (j) It is estimated that there will be 38-60 hours of sanding required for each winter season. (k) It is estimated that there will be 23-33 hours of pilot truck services required for each winter season. (l) It is estimated that 110-170m3 of sand will be applied for each winter season. (m) Depending on road conditions/time of year, the contract manager may request that only specific sections of FSR are to be sanded. (n) This will be an as-and-when-needed contract, so services will only be provided when approved by the contract manager.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Cranbrook, BC
--
Cranbrook, BC
Bid Date: Sep 14 2023
Cranbrook, BC
Bid Date: Oct 27 2023
Cranbrook, BC
--
Cranbrook, BC
Bid Date: Sep 26 2024
Cranbrook, BC
--
Cranbrook, BC
--
Cranbrook, BC
Bid Date: Nov 02 2023
Cranbrook, BC
--
Cranbrook, BC
--
Cranbrook, BC
Bid Date: Jun 06 2023
Cranbrook, BC
--
Cranbrook, BC
--
Coquitlam, BC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
